Bill of Quantity (BOQ) for Painting Work

Posted on January 31, 2024

Bill of Quantity for Painting Work

A Bill of Quantities (BOQ) for painting work is a document that provides a detailed list of materials, labor, and other resources required to complete a painting project. It is typically used in construction and renovation projects to facilitate accurate cost estimation and project management.

The BOQ serves as a comprehensive guide for contractors and suppliers, outlining the specific quantities and specifications needed for the painting work

“Here is a sample of the bill of quantity for Painting work, formatted as follows:

Click here below download button for to download this BOQ

Download Excel

Bill of Quantity For Painting Work

Si.No Description Unit Quantity Unit Rate Amount Remark
A All works must be according to drawings, specification and engineer instructions. Rates shall include Aas following "a" to "e"                                          
a All the painting materials used same as specified in project and should be approved and tested by approved local laboratory and have the final approved from the supervisor engineer.  
b The surface must be dry and clean before painting. 
c All painting works should provide the required coverage.
d All paint works must be according to specifications , drawings and supervisor engineer instructions.
e Smoothen surfaces of existing plastering before the Commencement paint
Prices of painting works for walls & ceilings shall include supply of all materials, scaffolds, workmanship & tools and anywhere else, needed, all according to drawings, specifications, and conditions and directed instructions by the Engineer or his representative.
1 Painting work for - Internal
1 For Oil Based Paint
1.1 Applying surface grinding to make an smoothen surface m2
1.2 Supply & Apply one coat primer over the smoothened surface (material as per project Specification ) m2
1.3 supply & apply two coasts of wall care putty over the primer surface (material as per project Specification ) m2
1.4 supply & apply First & final coat Painting over the wall care putty surface (material & color as per project Specification ) m2
1.5 For Service ducts / Lift (as per project specification ) m2
1.6 Above false ceiling areas (as per project specification ) m2
2 For water Based Paint
2.1 Applying surface grinding to make an smoothen surface m2
2.2 Supply & Apply one coat primer over the smoothened surface (material as per project Specification ) m2
2.3 supply & apply two coasts of wall care putty over the primer surface (material as per project Specification ) m2
2.4 supply & apply First & final coat Painting over the wall care putty surface (material & color as per project Specification ) m2
2.5 For Service ducts / Lift (as per project specification ) m2
2.6 Above false ceiling areas (as per project specification ) m2
3 Painting work for - External
3.1 Supply & Apply one coat primer (material as per project Specification ) m2
3.2 supply & apply First & final coat Painting over the primer surface (material & color as per project Specification ) m2
Total Value of Work done

Related posts:

Invoice Template – Suitable for All Industries

Bill of Quantity (BOQ) for Tiles & Marble

How to calculate the volume of Prism ?

How to Calculate the Weight of Reinforced Concrete Elements (Beam, Column, Slab)

How to Calculate the Surface Area and Volume of a Cone

How to Calculate Cement, Sand, Quantities for Plastering Work ?

How to calculate the Volume & Surface area of Circular Column / Volume Of Concrete / Area Of Shutter...

How to Calculate Cement, Sand, and Aggregate Quantities in Concrete?

Share this post to your social media

1 thought on “Bill of Quantity (BOQ) for Painting Work”

  1. Keobametse keotshepile says:
    April 9, 2025 at 10:15 am

    Kindly continue providing updates on all necessary information

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • 3D Designs
  • AutoCAD Drawings
  • Civil Engineering Gallery
  • Contact Us
  • Math Puzzle
  • Privacy Policy
  • Facebook
  • Threads
  • LinkedIn
  • YouTube
  • Instagram
  • Pinterest
  • X

How to Calculate Excavation Work (or) Volume of Excavation Quantity?

Bill of Quantity (BOQ) for Excavation & Back Filling Work

How to Calculate Quantities for Flooring Work from Drawing? How to calculate Tile, Marble, Granite Q...

How to Calculate Number of Brick Quantity in brick wall

Bill of Quantity (BOQ) for Metal Work

Bill of Quantity (BOQ) for Substructure Water Proofing Work

Payment Certificate Template – Suitable for All Industries

How to calculate volume & Water capacity of Circular Tank

  • 3D Elevation (19)
  • 3D Interior (27)
  • AutoCAD Drawing (61)
  • Basics of Engineering (56)
  • Bill of Quantity (12)
  • Calculator (4)
  • Civil Engineering Gallery (19)
  • Construction Templates (15)
  • Estimation (30)
  • INFO (3)
  • Math Puzzle (11)
  • Method Statements (5)
  • Uncategorized (2)
  • Non-Conformance Report (NCR) Template for Construction Projects
  • How to Calculate Footing Steel Reinforcement – Free Excel BBS Template
  • Project Monthly Progress Report Template
  • Project Progress Report -Template
  • Daily Site Report / Diary Template for Construction Projects
  • Invoice Template – Suitable for All Industries
  • 3D Designs
  • AutoCAD Drawings
  • Civil Engineering Gallery
  • Contact Us
  • Math Puzzle
  • Privacy Policy
  • Facebook
  • Threads
  • YouTube
  • LinkedIn
  • Instagram
  • Pinterest
  • X
©2025 | Design: Newspaperly WordPress Theme
Go to mobile version