Bill of Quantity (BOQ) for Carpentry Work

Bill of Quantity for Carpentry Work

A Carpentry Bill of Quantities (BOQ) is a concise document outlining the materials, labor, and quantities required for a carpentry project. Created by a quantity surveyor or estimator, it facilitates accurate cost estimation and fair bidding.

This detailed breakdown covers aspects such as material specifications, dimensions, and labor hours, providing transparency in the tendering process and serving as a crucial reference for project management.

“Here is a sample of the bill of quantity for Carpentry work, formatted as follows:

Click here below download button for to download this BOQ

BOQ For Carpentry work

Si.No Description Unit Quantity Unit Rate Amount Remark
All works must be according to drawings, specification and engineer instructions.
A Rate includes as follows "a" to "c"
a Material or other equipment supply to the side
b Labor & Machinary charges
c Wastages & cleaning
1 Door & Frames
Materials & designs as per drawings and specification
1.1 Main Door Laminate change with both side Ply & veneer Sqft
1.2 Door (D1) Laminate change with both side Ply Sqft
1.3 Door (D2) Laminate change with both side Ply Sqft
1.4 Kitchen Door Laminate change with both side Ply Sqft
1.5 Toilet & Bathroom doors with Laminate change Sqft
2 Windows & ventilator
Materials & designs as per drawings and specification Sqft
2.1 Living Hall Window Sqft
2.2 Bedroom Window Sqft
2.3 Kitchen Window Sqft
2.4 Toilet & Bathroom ventilators Sqft
3 TV Unit
Materials & designs as per drawings and specification
3.1 Living Room TV unit with Laminate finish Sqft
3.2 Bedroom TV units with Storage Sqft
4 Other
Materials & designs as per drawings and specification
4.1 Kicten self with storage Sqft
4.2 Living hall Storage Sqft
Total Value of Work done