Bill of Quantity (BOQ) for Metal Work

Posted on February 1, 2024

Bill of Quantity for Metal Work

A Bill of Quantities (BOQ) for metal work in construction is a detailed list specifying the quantities and types of metal materials, components, and labor needed for a project. It is crucial for estimating costs, tendering, and managing the construction process.

The BOQ outlines specifications, dimensions, quality standards, and special requirements for metal elements, aiding contractors in accurate cost assessments, competitive bidding, and transparent project execution.

“Here is a sample of the bill of quantity for metal work, formatted as follows:

Click here below download button for to download this BOQ

Download Excel

Bill of quantity for Metal work

Si.No Description Unit Quantity Unit Rate Amount Remark
A All works must be according to drawings, specification and engineer instructions. Rates shall include : "a" to "f"                           
a. Submitting samples for approval of material, accessories, color and fixation method. 
b. Anodized Aluminum profile windows, complete with glazing, silicone sealant, ironmonger and hardware as specified and as shown on the drawings. Minimum wall thickness for all aluminum profiles is 1.5mm.
c. All metal works include the fixation for frames and leaves and all required accessories according to the engineer's instructions.
d. Painting after smoothing and filling all the voids with putty,
e. Primer coat, undercoat and two oil coats and in galvanized steel the primer should be poly zinc.
f. Hardware, ironmongery and accessories should be aluminum, and All tests for thickness and color.
1 ALUMINUM WORK
1.1 Supply and fix powder coated colored aluminum window (W1) (section as per drawings & Specification), complete with frame, decorated and colored glass (required thick), insect screen leave, silicone sealant, ironmongery and hardware. All and anywhere else, needed, as per specifications and drawings.                           
1.2 Supply and fix powder coated colored aluminum window (W2) (section as per drawings & Specification), complete with frame, decorated and colored glass 6mm thick, ironmongery and hardware. And as per specifications and drawings.
1.3 Ditto but, Type (W3) 
1.4 Supply and install complete door (size-as per drawing) two leave AW4, for cabinet in the stair case with fiber sheet, switch, door hand with all accessories and required works
2 STEEL WORK
2.1 Supply and fix Multi Lock door (SD1-size as per drawing) ,complete with galvanized steel frame (required thick), ironmongery, all requirements latches, locks…etc. as per specifications ,drawings and supervisor engineer instructions
2.2 Supply and fix galvanized steel double external gate (SD1-size as per drawing) two leave, complete with polycarbonate sheets (6mm thick), frame 3mm thick, ironmongery, including decorated, hardware and oil painting include primer and under coat, with Wally switch and all requirement a latches, locks…etc. as per specifications , drawings and supervisor engineer instructions
2.3 Ditto but single  door (SD3-size as per drawing
2.4 Supply and install Galvanized Steel Grill for window type AW1 protection with all required works.
2.5 Ditto but for window Type AW2
2.6 Supply and install Galvanized Steel Handrail for stair landing with all required works
2.7 Supply & install galvanized steel ladder (required width) for water tanks consist of(required size) G.S Box section include fixation to slab by G.S plate (required thick). With all needed fitting, welding, painting with at least two coats oil paint over one coat polyzinc primer & the needed accessories to complete the job as shown in the drawings, specifications and the engineer’s instructions.
2.8 Supply and fix Roll galvanized steel door SD-R1 (size as per drawing), galvanized steel sheets (required thick), complete with frame 3 mm thick, ironmongery, hardware and oil painting include primer and under coat, with a locks 12mm and all requirement as latches, locks…etc. as per specifications, drawings and supervisor engineer instructions
Total Work Done Amount

Related posts:

How to Calculate the Surface Area and Volume of a Cone

How to Calculate Cement, Sand, Quantities for Plastering Work ?

How to Calculate Excavation Work (or) Volume of Excavation Quantity?

How to Calculate Quantities for Flooring Work from Drawing? How to calculate Tile, Marble, Granite Q...

Bill of Quantity (BOQ) for Tiles & Marble

Payment Certificate Template – Suitable for All Industries

Bill of Quantity (BOQ) for Masonry Work

How to Calculate the Weight of Reinforced Concrete Elements (Beam, Column, Slab)

Share this post to your social media

1 thought on “Bill of Quantity (BOQ) for Metal Work”

  1. Bereket zeihun says:
    October 8, 2024 at 4:23 am

    This is ma favourite website and i love my work
    I study computer science but i am working engineering in civil
    Keep it up

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • 3D Designs
  • AutoCAD Drawings
  • Civil Engineering Gallery
  • Contact Us
  • Math Puzzle
  • Privacy Policy
  • Facebook
  • Threads
  • LinkedIn
  • YouTube
  • Instagram
  • Pinterest
  • X

Bill of Quantity (BOQ) for Roof Water Proofing Work

Common Mathematical Symbols: Definitions and Uses

How to Calculate Cutting Length of Rectangular Column Ties (Stirrups)

How to Calculate Excavation Work (or) Volume of Excavation Quantity?

Bill of Quantity (BOQ) for Carpentry Work

Bill of Quantity (BOQ) For Plastering Work

How to Calculate Quantities for Flooring Work from Drawing? How to calculate Tile, Marble, Granite Q...

How to Calculate Quantities for Painting Quantity for Room Internal Walls From Drawing?

  • 3D Elevation (19)
  • 3D Interior (27)
  • AutoCAD Drawing (61)
  • Basics of Engineering (57)
  • Bill of Quantity (12)
  • Calculator (4)
  • Civil Engineering Gallery (19)
  • Construction Templates (17)
  • Estimation (31)
  • INFO (3)
  • Math Puzzle (12)
  • Method Statements (5)
  • Uncategorized (2)
  • Final Account Statement Template
  • Concrete Pour Card Template for Construction Projects
  • Non-Conformance Report (NCR) Template for Construction Projects
  • How to Calculate Footing Steel Reinforcement – Free Excel BBS Template
  • Project Monthly Progress Report Template
  • Project Progress Report -Template
  • 3D Designs
  • AutoCAD Drawings
  • Civil Engineering Gallery
  • Contact Us
  • Math Puzzle
  • Privacy Policy
  • Facebook
  • Threads
  • YouTube
  • LinkedIn
  • Instagram
  • Pinterest
  • X
©2025 | Design: Newspaperly WordPress Theme
Go to mobile version