🔥 Project Progress Report🔥 Daily Monitoring Report🔥 Productivity Analysis

Recommended for you

Compare

No products in the compare.

Return To Shop

View Compare

0 Compare
Wishlist

No products in the wishlist.

Return To Shop

View Wishlist Add all to cart

0 Wishlist
Shopping Bag

No products in the cart.

Return To Shop
Shopping cart (0)
Subtotal: $0,00

View cartCheckout

0 Shopping Bag $0,00
Site_Logo
Menu Categories
  • Home
  • Template shop
  • Construction Templates
  • AutoCAD Drawing
  • 3D Elevation
  • Basics of Engineering
  • Estimation
  • Bill of Quantity
  • Refund and Returns Policy
  • Template shop
  • Uncategorized
Wishlist
Compare
Account
  • Templates Category
    • Template shop
  • Home
  • Template shop
  • Construction Templates
  • AutoCAD Drawing
  • Method Statements
  • Basics of Engineering
  • Bill of Quantity
  • 3D Interior
  • Civil Engineering Gallery
  • Contact us
Log in

Lost your password?

Log in
Facebook Twitter Instagram Pinterest Linkedin
  • 3D Elevation
  • Engineering calculator
  • Math Puzzle
  • Estimation
  • Refund Policy
Download Now !

How to Calculate Backfilling Quantity (or) Volume of Backfilling Quantity?

April 22, 2022 /Posted byIyman Faisal / 4

Backfilling means the process used refilling soil (or) sand an excavated area, backfilling quantity usually calculating in m³ (Cubic meter), basically There are two type of backfilling method used in construction work.

1.Handmade Backfilling – The Soil is refilling by Humans.

2. Machinery made Backfilling – The Soil is refilling machinery.

For Example:–

Size of Footing

Length (L) – 3.00 m,
Width (B) – 2.50 m,
Thickness /Depth (D) -0.75 m

 Size of Column

Length (L) – 0.50 m
Width (B) – 0.50 m
Thickness /Depth (D) – 3.00 m

Size of PCC

Length (L) – 3.20 m,
Width (B) – 2.70 m,
Thickness /Depth (D) -0.10 m

So, Volume of Backfilling is,

Formula = Total Volume of Excavation Area – (Total Volume of PCC + Total Volume of Footing + Total Volume of Column) +10% of total Backfilling Quantity

What is 10% – While doing backfilling compaction need 10% of More Soil for backfilling, so 10% of total Quantity need to add in calculation for backfilling quantity.

Volume of Excavation = (3.20 +0.6+0.6) X (2.70+0.6+0.6) X (0.1+0.75+3.0) = 66.07 m³

           Total Volume of Excavation = 66.07 m³

Volume of PCC – Length X Width X Depth = 3.20 X 2.70 X 0.10 = 0.864 m³

Volume of Footing – Length X Width X Depth = 3.00 X 2.50 X 0.75 = 5.625 m³

Volume of Column – Length X Width X Depth = 0.50 X 0.50 X 3.00 = 0.75 m³

So, Total Volume of back filling is = (66.70 – (0.864+ 5.625+0.75)) + 10%

= (66.07-7.329) + 10%

= 58.831 + 10% of Total Back Filling Area

= 58.831 + (58.831 X 10%)

= 64.71 m³ Total Quantity of Soil (or) Sand required For Backfilling

So, TOTAL VOLUME OF BACK FILLING IS = 64.71 m³

Tags: Basics of civil engineering, civil engineering, civil formula, Civilengineeringqs, civilengineeringqs.com, Civilqs, How to Calculate Backfilling Quantity, quantity surveying, Volume of Backfilling Quantity
Share Post
  • Twitter
  • Facebook
  • VK
  • Pinterest
  • Mail to friend
  • Linkedin
  • Whatsapp
  • Skype
How to Calculate Excavation Wo...
What are the Types of Levels u...

Related posts

Read more

How to Calculate Footing Steel Reinforcement – Free Excel BBS Template

Continue reading
Read more

How to Calculate the Actual Width of a Road Cross Section

Continue reading
Read more

How to Calculate Footing Steel Reinforcement – Free Excel BBS Template

Continue reading
Read more

How to Calculate the Weight of Reinforced Concrete Elements (Beam, Column, Slab)

Continue reading
Read more

How to Calculate Cutting Length of Rectangular Column Ties (Stirrups)

Continue reading

4 comments

  • Abreeth

    March 20, 2024 - 5:56 pm

    Good Explanation , Easy to understand

    Reply
  • Dillip Kumar Nanda

    August 22, 2024 - 11:37 am

    20% of addition to be done in case of loose soil and 50% of addition or subtraction to be done in case of disintegrated rock.

    Reply
  • Evans Makungo

    October 14, 2024 - 3:21 pm

    Great approach.

    Reply
  • provy

    October 6, 2025 - 10:08 am

    good work, ladies and gents keep level up.
    yours is easy to understand.
    keep achieving more.

    Reply

Add comment Cancel reply

Your email address will not be published. Required fields are marked

Search

Categories

  • 3D Elevation (19)
  • 3D Interior (27)
  • AutoCAD Drawing (63)
  • Basics of Engineering (57)
  • Bill of Quantity (10)
  • Calculator (4)
  • Civil Engineering Gallery (19)
  • Construction Templates (26)
  • Estimation (32)
  • INFO (2)
  • Math Puzzle (12)
  • Method Statements (5)

Latest Post

How to Calculate Footing Steel Reinforcement ...

April 20, 2026 0

Contractor Inspection Request Form Template -2

March 16, 2026 0

Checklist for Block Work Template

February 5, 2026 0

Checklist for Concrete Work Template

February 4, 2026 0
Home
Shop
0 Wishlist
Search
Engineering Logo

Commit to Excellence

Get in touch with us

f you’ve got great templates and work dashboards your looking to work with us then drop us a line.

Facebook Instagram Pinterest
  • Information

    • Privacy Policy

    • Contact Us

    • Refund policy

Copyright © 2026 – Civil Engineering QS