Skip to content
Menu
  • Home
  • Basics of Engineering
  • Estimation
  • Bill of Quantity (BOQ)
  • Method Statements & Inspection
    • Method of statement
    • Inspection & Checklist
  • Math Puzzle
  • AutoCAD Drawings
  • 3D Designs
  • Question & Answers
    • Concrete Technology
    • Engineering Material
    • Surveying
    • Structural Analysis
    • Soil Mechanics & Foundation Engineering
    • Project management
    • Fluid Mechanics & Hydraulics
    • Transportation Engineering
    • Sanitary Engineering
  • Civil Engineering Gallery
  • Contact Us
Menu

How to Calculate Cement, Sand, and Aggregate Quantities in Concrete?

Posted on May 20, 2022April 8, 2025 by Iyman Faisal
Post views 10,610

CONCRETE:-

Concrete it’s a construction component, a mixture of cement, sand, and course or fine aggregate with water which is called us concrete, which is used in construction in different structures, In Construction industry concrete are used to mix in following ways as follows

1.Hand Mix Concrete 2. Machine mix Concrete 3. Ready Mix Concrete

How to Calculate Cement, Sand, and Aggregate Quantities in Concrete

For Example size of slab
Length (L) – 1m, Width (B) – 1m, Thickness /Depth (D) -1.0 m

SO, Total Volume of concrete = (L x B x D) = 1 x 1 x 1 = 1.0 mᶟ

if Grade of Concrete -M7.5 ,  Ratio of M 7.5 Concrete – 1 : 4 : 8

Which Means 1% of  Cement, 4% of  Sand & 8% of Aggregate

FORMULA TO FIND THE QUANTITIES OF CEMENT, SAND, AGGREGATE IS

Formula = \frac{Dry Volume of Concrete  *  Volume of Concrete  *  Ratio of (Cement / Sand /Aggregate) }{Total Ratio (Cement + Sand + Aggregate)}  

Dry Volume of Concrete -1.54 mᶟ  , Volume of Concrete -1.0 mᶟ

Ratio of Cement = 1,  Ratio of Sand =4,  Ratio of Aggregate =8 ,  Total Ratio (1+ 4+ 8) = 13

Required Quantity of Cement , Sand & Aggregate in 10 mᶟ Concrete is

Cement = \frac{1.54 * 1 * 1}{ 1 +  4 +  8}   = 0.118 mᶟ


Sand= \frac{1.54 * 1 * 4}{ 1 +  4 +  8}   = 0.474 mᶟ


Aggregate = \frac{1.54 * 1 * 8}{ 1 +  4 +  8}   = 0.948 mᶟ

Which Means 1.0 mᶟ of M7.5 Grade Concrete Required,

Cement – 0.118 mᶟ / 1mᶟ of cement Equal to 29 bags of Cement,

So, 1.184 x 29 = 3.43 Bags of Cement is required

1 Bag of cement to is Equal to 50Kg, So 50 x 3.43 = 171.169 kg Cement Required (Without Any Wastage)

Sand – 0.474 mᶟ / 1mᶟ equal to 35.31 cu.ft / cubic foot / ftᶟ

So, 0.474 x 35.31 = 16.732 cu.ft / cubic foot Sand is required (Without Any Wastage)

Aggregate – 0.948 mᶟ / 1mᶟ equal to 35.31 cu.ft / cubic foot / ftᶟ

So, 0.948 x 35.31 = 33.463 cu.ft / cubic foot Aggregate is required (Without Any Wastage)

Related posts:

How to Calculate Excavation Work (or) Volume of Excavation Quantity?

Bill of Quantity (BOQ) for Tiles & Marble

How to Calculate the Surface Area and Volume of a Cone

How to Calculate Cutting Length of Circular Ties (Links)

How to Calculate Cement, Sand, Quantities for Plastering Work ?

How to calculate the volume of Prism ?

How to calculate the Volume & Surface area of Rectangular Column / Volume Of Concrete / Area Of Shut...

How to Calculate Quantities for Painting Quantity for Room Internal Walls From Drawing?

Share this post to your social media

4 thoughts on “How to Calculate Cement, Sand, and Aggregate Quantities in Concrete?”

  1. Israfil says:
    August 19, 2023 at 6:15 pm

    Hi, may I get all information of civil engineering calculation?

    Reply
  2. LASISI TAOFEEK says:
    August 19, 2023 at 6:17 pm

    The NOTE is very interesting. I wish you to supply me more it. Thanks.

    Reply
  3. Wahab Kamolideen says:
    August 20, 2023 at 2:12 am

    How did you convert volume of cement to bag of cement?

    Reply
    1. Iyman Faisal says:
      August 20, 2023 at 6:28 am

      1mᶟ of cement Equal to 29 bags of Cement,
      1 Bag of cement to is Equal to 50Kg.
      For full details:- https://civilengineeringqs.com/how-to-calculate-cement-sand-and-aggregate-quantities-in-concrete/

      Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • 3D Designs
  • AutoCAD Drawings
  • Civil Engineering Gallery
  • Contact Us
  • Math Puzzle
  • Privacy Policy
  • Facebook
  • Threads
  • LinkedIn
  • YouTube
  • Instagram
  • Pinterest
  • X

Most Viewed Posts

  • Civil Engineering GalleryCivil Engineering Gallery (65,390)
  • Contact Us (37,337)
  • Bill of Quantity (BOQ) for Excavation & Back Filling Work (29,185)
  • How to Calculate Backfilling Quantity (or) Volume of Backfilling Quantity? (25,576)
  • How to calculate concrete Volume for Rectangular, Square & Circular Column (19,326)
  • 3D Elevation (19)
  • 3D Interior (27)
  • AutoCAD Drawing (24)
  • Basics of Engineering (54)
  • Bill of Quantity (10)
  • Civil Engineering Gallery (36)
  • Estimation (27)
  • Math Puzzle (6)
  • Method Statements & Inspection (1)
  • Question & Answers (10)
  • Uncategorized (5)
  • How to Calculate Cutting Length of Circular Ties (Links)
    How to Calculate Cutting Length of Circular Ties (Links) in...
  • Ductile Iron Manhole Covers Detailed Explanation
    Manhole cover A manhole cover is a removable plate that...
  • Common Mathematical Symbols: Definitions and Uses
    Mathematical symbols are important tools that help us to understand...
  • How to calculate the slant length of cone
    What is Slant length of cone To finding slant length...
  • How to Calculate the Surface Area and Volume of a Cone
    How to Calculate the Surface Area and Volume of a...
  • 3D Designs
  • AutoCAD Drawings
  • Civil Engineering Gallery
  • Contact Us
  • Math Puzzle
  • Privacy Policy
  • Facebook
  • Threads
  • YouTube
  • LinkedIn
  • Instagram
  • Pinterest
  • X
©2025 | Design: Newspaperly WordPress Theme