Skip to content
Menu
  • Home
  • Basics of Engineering
  • Estimation
  • Bill of Quantity (BOQ)
  • Method Statements & Inspection
    • Method of statement
    • Inspection & Checklist
  • Math Puzzle
  • AutoCAD Drawings
  • 3D Designs
  • Question & Answers
    • Concrete Technology
    • Engineering Material
    • Surveying
    • Structural Analysis
    • Soil Mechanics & Foundation Engineering
    • Project management
    • Fluid Mechanics & Hydraulics
    • Transportation Engineering
    • Sanitary Engineering
  • Civil Engineering Gallery
  • Contact Us
Menu

How to Calculate Excavation Work (or) Volume of Excavation Quantity?

Posted on April 20, 2022April 8, 2025 by Iyman Faisal
Post views 17,577

Excavation means work involving the removal of soil or sand or rock from earth, basically two types of excavation methods used in construction

1.Handmade excavation – The Soil or sand or rock is excavating by Humans.

2. Machinery made excavation -The Soil or sand or rock is excavating by machineries.

Volume of Excavation is,

For Example:-

Size of Footing
Length (L) – 3.00 m,
Width (B) – 2.50 m,
Thickness /Depth (D) -0.75 m

 Size of Column Length (L) – 0.50 m
Width (B) – 0.50 m
Thickness /Depth (D) – 3.00 m

Size of PCC Length (L) – 3.20 m,
Width (B) – 2.70 m,
Thickness /Depth (D) -0.10 m

So, Volume of Excavation is

Formula = (Length of PCC + Working Space) X (Width of PCC + Working Space) X (Height of PCC + Height of Footing + Height of Column)

What is working space and description of working space given below this article

Volume of Excavation = (3.20 +0.6+0.6) X (2.70+0.6+0.6) X (0.1+0.75+3.0)

Total Volume of Excavation = 66.07 m³

What is Working Space: – Working space is the additional space provided between both edges of the excavation of the footing, which is used for the labor movement, using machinery, removing shuttering boards, pouring of concrete, etc.

Working spaces are considered depending on structures varying between shallow and deep foundations.

Shallow Foundation: – if the depth of excavation is less than 0.6m which is called the shallow foundation, for this condition working space is not required.

Deep Foundation: – if the depth of excavation is up to 3.0m or above which is called a deep foundation.

If the depth of the deep foundation is up to 3.0 m working space provides 600mm of all the four sides of the footings.

If the depth of the deep foundation is more than 3.0 m working space to be provided 600+50mm (for every 1 meter) shall be added on all four sides of the footing edge. 

Related posts:

Bill of Quantity (BOQ) for Excavation & Back Filling Work

How to Calculate Cutting Length of Circular Ties (Links)

Bill of Quantity (BOQ) For Plastering Work

Bill of Quantity (BOQ) for Masonry Work

Bill of Quantity (BOQ) for Roof Water Proofing Work

How to Calculate Backfilling Quantity (or) Volume of Backfilling Quantity?

How to Calculate Cement, Sand, and Aggregate Quantities in Concrete?

How to Calculate Cement, Sand, Quantities for Plastering Work ?

Share this post to your social media

6 thoughts on “How to Calculate Excavation Work (or) Volume of Excavation Quantity?”

  1. Iyman Faisal says:
    March 30, 2023 at 7:10 pm

    Thank you for your kind words!

    Reply
  2. Augustine Lahai says:
    August 16, 2023 at 5:35 am

    The lesson was very helpful,thanks so much.

    Reply
  3. Ibrahim Alhassan says:
    August 16, 2023 at 9:50 am

    Very interesting

    Reply
  4. Lwanga says:
    August 16, 2023 at 12:07 pm

    Truly educational, thanks alot.

    Reply
  5. Victoria Addington says:
    October 19, 2023 at 7:28 pm

    It was fascinating to know that working space is used for the labor movement. My friend told me that their project requires excavation. I think it’s best to hire an expert in excavation to ensure quality work.

    Reply
  6. Mawa charles says:
    January 23, 2024 at 6:35 pm

    I do much impressed about the lesson I learned. Thanks alot I encourage you to continue.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • 3D Designs
  • AutoCAD Drawings
  • Civil Engineering Gallery
  • Contact Us
  • Math Puzzle
  • Privacy Policy
  • Facebook
  • Threads
  • LinkedIn
  • YouTube
  • Instagram
  • Pinterest
  • X

Most Viewed Posts

  • Civil Engineering GalleryCivil Engineering Gallery (65,390)
  • Contact Us (37,337)
  • Bill of Quantity (BOQ) for Excavation & Back Filling Work (29,184)
  • How to Calculate Backfilling Quantity (or) Volume of Backfilling Quantity? (25,576)
  • How to calculate concrete Volume for Rectangular, Square & Circular Column (19,326)
  • 3D Elevation (19)
  • 3D Interior (27)
  • AutoCAD Drawing (24)
  • Basics of Engineering (54)
  • Bill of Quantity (10)
  • Civil Engineering Gallery (36)
  • Estimation (27)
  • Math Puzzle (6)
  • Method Statements & Inspection (1)
  • Question & Answers (10)
  • Uncategorized (5)
  • How to Calculate Cutting Length of Circular Ties (Links)
    How to Calculate Cutting Length of Circular Ties (Links) in...
  • Ductile Iron Manhole Covers Detailed Explanation
    Manhole cover A manhole cover is a removable plate that...
  • Common Mathematical Symbols: Definitions and Uses
    Mathematical symbols are important tools that help us to understand...
  • How to calculate the slant length of cone
    What is Slant length of cone To finding slant length...
  • How to Calculate the Surface Area and Volume of a Cone
    How to Calculate the Surface Area and Volume of a...
  • 3D Designs
  • AutoCAD Drawings
  • Civil Engineering Gallery
  • Contact Us
  • Math Puzzle
  • Privacy Policy
  • Facebook
  • Threads
  • YouTube
  • LinkedIn
  • Instagram
  • Pinterest
  • X
©2025 | Design: Newspaperly WordPress Theme