Post views 7,632 Excavation means work involving the removal of soil or sand or rock from earth, Excavation quantity usually calculating in m³ (Cubic meter) Backfilling means the process used refilling soil (or) sand…
Tag: Civilqs
How to Calculate Quantities for Flooring Work from Drawing? How to calculate Tile, Marble, Granite Quantity for floor from drawing?
Post views 2,945 Flooring Area is a horizontal Area usually different type of materials are used in flooring work like (concrete flooring, Tile, Granite, marble etc.… How to calculate Quantities for Flooring…
How to Calculate Number of blocks or Hollow blocks Quantities in block wall ?
Post views 4,538 How to Calculate Number of blocks or Hollow blocks Quantities in block wall ? Hollow Block :- is a concrete block used in construction to build an internal &…
How to Calculate Number of Brick Quantity in brick wall
Post views 2,841 Brick is a construction material it’s made up with clay, composition of brick is Lime 2 to 5% Alumina-clay 20 to 30%, Silica-Sand – 50 to 60%, Bricks are…
How to Calculate Cement, Sand, Quantities for Plastering Work ?
Post views 5,270 Plastering: – This work activity means a thin layer of mortar, applied over the Wall & ceiling masonry, which it acts like a damp-proof coat over the masonry work…
How to Calculate Cement, Sand, and Aggregate Quantities in Concrete?
Post views 7,456 CONCRETE:-Concrete it’s a construction component, a mixture of cement, sand, and course or fine aggregate with water which is called us concrete, which is used in construction in different…
Bill of Quantity for Roof Water Proofing Work , BOQ For Roof Water Proofing Work
Post views 2,785 Waterproofing Work Buildings is the method of forming a barrier over surfaces of foundations, roofs, walls, bathrooms and other structural members of buildings to prevent water penetrations through these surfaces….
Bill of Quantity for Substructure Water Proofing Work , BOQ For Substructure Water Proofing work
Post views 2,665 Waterproofing Work Buildings is the method of forming a barrier over surfaces of foundations, roofs, walls, bathrooms and other structural members of buildings to prevent water penetrations through these surfaces. In…
How to Calculate Backfilling Quantity (or) Volume of Backfilling Quantity?
Post views 11,857 Backfilling means the process used refilling soil (or) sand an excavated area, backfilling quantity usually calculating in m³ (Cubic meter), basically There are two type of backfilling method used…
How to Calculate Excavation Work (or) Volume of Excavation Quantity?
Post views 9,586 Excavation means work involving the removal of soil or sand or rock from earth, basically two types of excavation methods used in construction 1.Handmade excavation – The Soil or…
How to Calculate Weight of Reinforced steel Rod
Post views 3,789 Usually 6mm, 8mm,10mm,12mm, 16mm, 20mm, 25mm, 32mm, 40mm dia size of reinforced steel bar used in construction, in this bars 6mm & 8mm are called as plain bar and…