🔥 Project Progress Report🔥 Daily Monitoring Report🔥 Productivity Analysis

Recommended for you

Compare

No products in the compare.

Return To Shop

View Compare

0 Compare
Wishlist

No products in the wishlist.

Return To Shop

View Wishlist Add all to cart

0 Wishlist
Shopping Bag

No products in the cart.

Return To Shop
Shopping cart (0)
Subtotal: $0,00

View cartCheckout

0 Shopping Bag $0,00
Site_Logo
Menu Categories
  • Home
  • Template shop
  • Construction Templates
  • AutoCAD Drawing
  • 3D Elevation
  • Basics of Engineering
  • Estimation
  • Bill of Quantity
  • Refund and Returns Policy
  • Template shop
  • Uncategorized
Wishlist
Compare
Account
  • Templates Category
    • Template shop
  • Home
  • Template shop
  • Construction Templates
  • AutoCAD Drawing
  • Method Statements
  • Basics of Engineering
  • Bill of Quantity
  • 3D Interior
  • Civil Engineering Gallery
  • Contact us
Log in

Lost your password?

Log in
Facebook Twitter Instagram Pinterest Linkedin
  • 3D Elevation
  • Engineering calculator
  • Math Puzzle
  • Estimation
  • Refund Policy
Download Now !

Bill of Quantity (BOQ) for Concrete Work

January 8, 2023 /Posted byIyman Faisal

What is Concrete & BOQ for Concrete Work

Concrete it’s a construction component, a mixture of cement, sand, and course or fine aggregate with water which is called us concrete, which is used in construction in different structures.

A Bill of Quantity (BOQ) for concrete work is a detailed document that itemizes and quantifies all the materials, labor, equipment, and other resources required for a specific concrete construction project. It serves as a comprehensive guide for estimating costs, procuring materials, and executing the concrete work according to the project specifications.

“Here is a sample of the bill of quantity for concrete work, formatted as follows

Click here below download button for to download this BOQ

Bill of Quantity for Concrete Work

Si.No Description Unit Rate Quantity Amount
1 Rates of Concrete Works shall include :-        
1.1 Supplying, Casting, vibrating and curing as per specifications. Included    
1.2 Approved additives and admixtures. Included    
1.3 Incurred costs on New Concrete Job Mix Designs, Sampling, testing and providing test results certificates, storing and saving of samples, and preparation of bar bending schedules and workshops. Included    
1.4 Compaction and testing under the foundation, ground beams, and ground slabs, the compaction must exceed 98% of MDD. Included    
1.5 Prices including Mix Design, striking, polyethylene sheet (for any concrete contact with the soil) Included    
1.6 external surfaces, workmanship, all ducts, sleeves, opening areas and the concrete surface shall be finished with mechanical steel trowel and the price shall include steel trowelling with smooth face (fair face)and anywhere else, needed Included    
1.7 All works according to specifications , drawings and supervisor engineer instructions Included    
  Plain Cement concrete -A        
A Supply and cast plain Cement concrete-A (200) kg/cm2 & including all Materials & as per Drawings Specification & supervisor engineer instructions        
A.1 For Below foundations, supports, anchor blocks, benching, slopes.   For blinding beds including polythene sheets as per specifications. m3      
  Reinforced Cement Concrete - B        
B Supply and cast ready mix reinforced concrete-B (300) kg/cm2 & including all Materials & as per Drawings Specification & supervisor engineer instructions        
B.1 For Foundations &  ground beams m3      
B.2 For stairs including flights, landings, steps & drop beams m3      
B.3 Beams, Ramp & parapet m3      
B.4 For inverted beams everywhere in the slab drainage, electrical, air conditioning, mechanical ducts m3      
B.5 For solid slab, staircase slab and duct Slab & Concrete Decoration m3      
  Reinforced Cement Concrete - C        
C Supply and cast ready mix reinforced concrete-C (350) kg/cm2 & including all Materials & as per Drawings Specification & supervisor engineer instructions        
C.1 For columns and column necks m3      
C.2 For reinforced walls and solid slab and Openings cover pre-casting m3      
  Reinforced Cement Concrete - D        
D Supply and cast ready mix reinforced concrete-D (250) kg/cm2 & including all Materials & as per Drawings Specification & supervisor engineer instructions        
D.1 For Ground Slab 10cm thick with steel mesh 8mm diameter every 20cm including polythene sheets below concrete slab m3      
D.2 For External steps & its edge beams. Including flights, landings, steps, drop, inverted beams and hand rail wall including entrance stairs, Ramp & parapet m3      
D.3 For Expansion joints inverted beams at the roof m3      
D.4 For doors and Windows lintels and roof coping m3      
           
  Total Value of Work Done        

Tags: Basics of civil engineering, bill of quantity, bill of quantity for concrete, Bill of Quantity for Concrete Work, boq for concrete, BOQ For Concrete Work, civil calculation, civil construction, civil engineering, Construction bill of Quantity, Construction BOQ
Share Post
  • Twitter
  • Facebook
  • VK
  • Pinterest
  • Mail to friend
  • Linkedin
  • Whatsapp
  • Skype
IMPORTANT NOTES ABOUT STEEL / ...
Bill of Quantity (BOQ) for Mas...

Related posts

Read more

How to Calculate Footing Steel Reinforcement – Free Excel BBS Template

Continue reading
Read more

How to Calculate the Actual Width of a Road Cross Section

Continue reading
Read more

How to Calculate Footing Steel Reinforcement – Free Excel BBS Template

Continue reading
Read more

How to Calculate the Weight of Reinforced Concrete Elements (Beam, Column, Slab)

Continue reading
Read more

How to Calculate Cutting Length of Rectangular Column Ties (Stirrups)

Continue reading

6 comments

  • Melissa

    January 9, 2023 - 11:15 am

    Its more useful, Really appreciate this work.

    • Iyman FaisalAuthor

      March 30, 2023 - 7:12 pm

      Thank you for your kind words!

  • Decorative Garden Wall

    June 10, 2023 - 7:09 am

    Insightful advice on drafting a Bill of Quantity for concrete work is provided in this blog post. It illustrates why it’s crucial to make precise material and price estimates for concrete construction jobs. Professionals in the fields of civil engineering and construction will find the post’s extensive instructions and guidelines for creating a BOQ to be an invaluable resource.

  • concrete driveway contractors near me

    September 21, 2023 - 6:25 am

    If you want to increase your familiarity just keep visiting this website and be updated with the most
    up-to-date gossip posted here.

  • Nicholle Marone

    November 23, 2023 - 12:39 pm

    It’s difficult to acquire knowledgeable folks with this topic, nevertheless, you seem like there’s more you are referring to! Thanks

  • Jody Nuchols

    November 25, 2023 - 5:18 am

    Great website! I am loving it!! Will be back later to read some more. I am bookmarking your feeds also

Search

Categories

  • 3D Elevation (19)
  • 3D Interior (27)
  • AutoCAD Drawing (63)
  • Basics of Engineering (57)
  • Bill of Quantity (10)
  • Calculator (4)
  • Civil Engineering Gallery (19)
  • Construction Templates (26)
  • Estimation (32)
  • INFO (2)
  • Math Puzzle (12)
  • Method Statements (5)

Latest Post

How to Calculate Footing Steel Reinforcement ...

April 20, 2026 0

Contractor Inspection Request Form Template -2

March 16, 2026 0

Checklist for Block Work Template

February 5, 2026 0

Checklist for Concrete Work Template

February 4, 2026 0
Home
Shop
0 Wishlist
Search
Engineering Logo

Commit to Excellence

Get in touch with us

f you’ve got great templates and work dashboards your looking to work with us then drop us a line.

Facebook Instagram Pinterest
  • Information

    • Privacy Policy

    • Contact Us

    • Refund policy

Copyright © 2026 – Civil Engineering QS