🔥 Project Progress Report🔥 Daily Monitoring Report🔥 Productivity Analysis

Recommended for you

Compare

No products in the compare.

Return To Shop

View Compare

0 Compare
Wishlist

No products in the wishlist.

Return To Shop

View Wishlist Add all to cart

0 Wishlist
Shopping Bag

No products in the cart.

Return To Shop
Shopping cart (0)
Subtotal: $0,00

View cartCheckout

0 Shopping Bag $0,00
Site_Logo
Menu Categories
  • Home
  • Template shop
  • Construction Templates
  • AutoCAD Drawing
  • 3D Elevation
  • Basics of Engineering
  • Estimation
  • Bill of Quantity
  • Refund and Returns Policy
  • Template shop
  • Uncategorized
Wishlist
Compare
Account
  • Templates Category
    • Template shop
  • Home
  • Template shop
  • Construction Templates
  • AutoCAD Drawing
  • Method Statements
  • Basics of Engineering
  • Bill of Quantity
  • 3D Interior
  • Civil Engineering Gallery
  • Contact us
Log in

Lost your password?

Log in
Facebook Twitter Instagram Pinterest Linkedin
  • 3D Elevation
  • Engineering calculator
  • Math Puzzle
  • Estimation
  • Refund Policy
Download Now !

Bill of Quantity (BOQ) for Excavation & Back Filling Work

August 9, 2022 /Posted byIyman Faisal / 1

Excavation means work involving the removal of soil or sand or rock from earth, Excavation quantity usually calculating in m³ (Cubic meter)

Backfilling means the process used refilling soil (or) sand an excavated area, backfilling quantity usually calculating in m³ (Cubic meter)

Backfilling and Excavation Bill of Quantities (BOQ) are essential components in construction and civil engineering projects, detailing the scope of work and associated costs for excavation and backfill activities.

“Here is a sample of the bill of quantity for excavation & backfilling, formatted as follows

Click here below download button for to download this BOQ

Click here below download button for to download this excavation & backfilling work BOQ

BOQ For Excavation & backfilling Work

BILL OF QUANTITY FOR EXCAVATION AND BACK FILLING WORK
Si.No Description Unit Quantity Unit Rate Amount Remark
EXCAVATION OF EARTH WORK - EXCAVATING WITH ANY MATERIAL
1 Removal of Grass, Rubbish,root,and all kind of dumbed material from the site m2
2 Earth Work Excavation , Depth is not Exceeding 1.50 m m3
3 Earth Work Excavation , Depth is not Exceeding 4.0 m ( Rate is over corresponding basic item for depth up to 4.0m) m3
4 Earth Work Excavation , Depth is over 4.0 m ( Rate is over corresponding basic item for depth over 4.0m ) m3
6 Filling with available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift u pto 1.5 m m3
4 Remove surplus excavated material from the site m3
BACK FILLING BY IMPORTED SOIL INCLUDING OF FILLING BY LAYERS, LEVELLING , AND WELL COMPACTION
5 Providing and laying (consolidated thickness) hard core fill (Stone soiling), under footing, paving's and other locations, with approved hard stones of size 150-200 mm and down, thoroughly filled with smaller chips, Dry soiling and consolidated to require level complete Item
6 Supplying and filling in plinth with fine sand under floors including, watering, ramming, consolidating and dressing complete m3
7 Back filling, Earth filling into excavation , Depth is not Exceeding 1.50 m m3
8 Earth filling into excavation , Depth is not Exceeding 4.0 m ( Rate is over corresponding basic item for depth up to 4.0m m3
9 Earth filling into excavation , Depth is above the 4.0 m ( Rate is over corresponding basic item for depth over 4.0m m3
Sundries
10 Anti-Termite Treatment :- Providing and injecting chemical emulsions for pre-construction anti-termite treatment and creating continuous chemical barrier under and all around the column pits, wall trenches, top surfaces of plinth filling, junctions of walls and floors, along the external perimeter of buildings, expansion joints, over the top surface of consolidated earth on which plinth protection is to be laid, surrounding of pipes and conduits etc. Item
Total Amount For Excavation and Back Filling Work
Tags: Basics of civil engineering, bill of quantity, bill of quantity for excavation, Bill of Quantity for Excavation & Back Filling Work, boq, boq for backfilling, boq for excavation, BOQ For Excavation & Back Filling Work, civil engineering, Civilengineeringqs, civilengineeringqs.com, Civilqs, Construction bill of Quantity, Construction BOQ, quantity surveying
Share Post
  • Twitter
  • Facebook
  • VK
  • Pinterest
  • Mail to friend
  • Linkedin
  • Whatsapp
  • Skype
What is Cover Block, Importanc...
Unit Weight of Construction Ma...

Related posts

Read more

How to Calculate Footing Steel Reinforcement – Free Excel BBS Template

Continue reading
Read more

How to Calculate the Actual Width of a Road Cross Section

Continue reading
Read more

How to Calculate Footing Steel Reinforcement – Free Excel BBS Template

Continue reading
Read more

How to Calculate the Weight of Reinforced Concrete Elements (Beam, Column, Slab)

Continue reading
Read more

How to Calculate Cutting Length of Rectangular Column Ties (Stirrups)

Continue reading

One comment

  • https://minikoparki.sklep.pl

    October 2, 2023 - 5:14 pm

    Definitely imagine that that you stated. Your favorite
    justification seemed to be on the net the easiest thing to have in mind of.
    I say to you, I definitely get irked while other people think about concerns that they plainly don’t recognise about.

    You managed to hit the nail upon the highest as
    neatly as outlined out the whole thing with no need side-effects
    , other folks can take a signal. Will probably be again to get more.
    Thanks

    Reply

Add comment Cancel reply

Your email address will not be published. Required fields are marked

Search

Categories

  • 3D Elevation (19)
  • 3D Interior (27)
  • AutoCAD Drawing (63)
  • Basics of Engineering (57)
  • Bill of Quantity (10)
  • Calculator (4)
  • Civil Engineering Gallery (19)
  • Construction Templates (26)
  • Estimation (32)
  • INFO (2)
  • Math Puzzle (12)
  • Method Statements (5)

Latest Post

How to Calculate Footing Steel Reinforcement ...

April 20, 2026 0

Contractor Inspection Request Form Template -2

March 16, 2026 0

Checklist for Block Work Template

February 5, 2026 0

Checklist for Concrete Work Template

February 4, 2026 0
Home
Shop
0 Wishlist
Search
Engineering Logo

Commit to Excellence

Get in touch with us

f you’ve got great templates and work dashboards your looking to work with us then drop us a line.

Facebook Instagram Pinterest
  • Information

    • Privacy Policy

    • Contact Us

    • Refund policy

Copyright © 2026 – Civil Engineering QS