🔥 Project Progress Report🔥 Daily Monitoring Report🔥 Productivity Analysis

Recommended for you

Compare

No products in the compare.

Return To Shop

View Compare

0 Compare
Wishlist

No products in the wishlist.

Return To Shop

View Wishlist Add all to cart

0 Wishlist
Shopping Bag

No products in the cart.

Return To Shop
Shopping cart (0)
Subtotal: $0,00

View cartCheckout

0 Shopping Bag $0,00
Site_Logo
Menu Categories
  • Home
  • Template shop
  • Construction Templates
  • AutoCAD Drawing
  • 3D Elevation
  • Basics of Engineering
  • Estimation
  • Bill of Quantity
  • Refund and Returns Policy
  • Template shop
  • Uncategorized
Wishlist
Compare
Account
  • Templates Category
    • Template shop
  • Home
  • Template shop
  • Construction Templates
  • AutoCAD Drawing
  • Method Statements
  • Basics of Engineering
  • Bill of Quantity
  • 3D Interior
  • Civil Engineering Gallery
  • Contact us
Log in

Lost your password?

Log in
Facebook Twitter Instagram Pinterest Linkedin
  • 3D Elevation
  • Engineering calculator
  • Math Puzzle
  • Estimation
  • Refund Policy
Download Now !

Bill of Quantity (BOQ) For Plastering Work

January 22, 2023 /Posted byIyman Faisal / 0

Plastering :-
This work activity means a thin layer of mortar, applied over the Wall & ceiling masonry, which it acts like a damp-proof coat over the masonry work

A Bill of Quantities (BOQ) for plastering work is a detailed document outlining the quantity and specifications of materials, labor, and other resources required for a plastering project. It includes a comprehensive list of items such as plaster types, thickness, surface preparation, and finishes.

The BOQ serves as a crucial tool for contractors and clients, facilitating accurate cost estimation and project management by providing a breakdown of quantities and unit rates for each aspect of the plastering work, ensuring transparency and clarity in the construction or renovation process.

“Here is a sample of the bill of quantity for plastering work, formatted as follows:”

Standard Plaster Thickness

Plastering Area Thickness of Plaster
Inner Plaster Work 10-12 mm
Outer Plaster Work 15-20 mm
Outer Plaster Work 6-8 mm

Click here below download button for to download this BOQ

Bill of Quantity for Plastering Work

Si.No Description Unit Rate Quantity Amount
1 Rates of Plastering Works shall include :-        
A supply of all materials, galvanized angles (for exposed edges), galvanized mesh (between block wall and concrete), mixing, scaffolds, curing, workmanship & tools and anywhere else, needed, all according to drawings, specifications, conditions and directed instructions by the Engineer or his representative..ions. included    
1 Internal Plastering on Ceiling    
1.1 Supply and make internal plastering 6 to 8 mm thickness and plumb, Cement , Sand Ratio (as per Specification) on Ceiling, Rates to include application on all types of surfaces, at all levels. Allow for Providing and fixing galvanized chicken mesh 300mm wide and 0.5mm thick and provide 12mm groove at junctions of brick and concrete members (if needed). Mesh to be properly stretched and nailed ensuring equal thickness of plaster on both sides of the mesh. Providing necessary plaster grooves as per design, etc. Note: Curing should be done in 7-10 days Works include all materials needed to finish the works according to specifications , drawings and supervisor engineer's instructions m2    
2 Internal Plastering on Walls
2.1 Supply and make internal plastering 12 to 15 mm mm thickness at all heights in line, level, and plumb, Cement , Sand Ratio (as per Specification) on brick walls or block walls, Rates to include application on all types of surfaces, at all levels. Allow for Providing and fixing galvanized chicken mesh 300mm wide and 0.5mm thick and provide 12mm groove at junctions of brick and concrete members (if needed). Mesh to be properly stretched and nailed ensuring equal thickness of plaster on both sides of the mesh. Providing necessary plaster grooves as per design, etc. Note: Curing should be done in 7-10 days Works include all materials needed to finish the works according to specifications , drawings and supervisor engineer's instructions m2
3 Internal Plastering with Waterproofing on Walls
3.1 Supply and make internal plastering 12 to 15 mm thickness at all heights in line, level, and plumb, Cement, Sand Ratio (as per Specification) admixed with proprietary waterproofing compound conforming to IS: 2645 on brick walls or block walls. Rates to include application on all types of surfaces, at all levels. Allow for Providing and fixing galvanized chicken mesh of 300mm wide and 0.5mm thick and provide 12mm groove at junctions of brick and concrete members (if needed). Mesh to be properly stretched and nailed ensuring equal thickness of plaster on both sides of the mesh. No separate payment shall be made for providing and fixing chicken mesh. Providing necessary plaster grooves as per design, etc. complete Filling water up to top level for checking, testing & curing for 4-5 days as directed by the Engineer in charge / Architect / Employer Note: Curing should be done in 7-10 days, Works include all materials needed to finish the works according to specifications, drawings and supervisor engineer's instructions m2
4 External Plastering with Waterproofing on Walls
4.1 Supply and make External plastering 15 to 18 mm. thick plaster on external walls in Cement, Sand Ratio (as per Specification) mixed with waterproofing compound conforming to IS: Approved waterproofing agent as per specifications, Rates to include application on all types of surfaces, at all levels. And provide a 12mm groove at junctions of brick and concrete members (if needed). (All work up to 15.0 Meter height from the plinth) Note: Curing should be done in 7-10 days, Works include all materials needed to finish the works according to specifications, drawings and supervisor engineer's instructions m2
4.2 Supply and make External plastering 15 to 18 mm. thick plaster on external walls in Cement, Sand Ratio (as per Specification) mixed with waterproofing compound conforming to IS: Approved waterproofing agent as per specifications, Rates to include application on all types of surfaces, at all levels. And provide a 12mm groove at junctions of brick and concrete members (if needed). For Above 15.0 Meter height from the plinth Note: Curing should be done in 7-10 days, Works include all materials needed to finish the works according to specifications, drawings and supervisor engineer's instructions m2
  Total Value of Work Done        

Tags: Basics of civil engineering, bill of quantity, Bill of Quantity for plastering, Bill of Quantity For Plastering Work, boq, Boq for plastering, boq for Plastering Work, civil engineering, Civilengineeringqs, Construction bill of Quantity, Construction BOQ
Share Post
  • Twitter
  • Facebook
  • VK
  • Pinterest
  • Mail to friend
  • Linkedin
  • Whatsapp
  • Skype
Bill of Quantity (BOQ) for Mas...
Important Notes about Civil En...

Related posts

Read more

How to Calculate Footing Steel Reinforcement – Free Excel BBS Template

Continue reading
Read more

How to Calculate the Actual Width of a Road Cross Section

Continue reading
Read more

How to Calculate Footing Steel Reinforcement – Free Excel BBS Template

Continue reading
Read more

How to Calculate the Weight of Reinforced Concrete Elements (Beam, Column, Slab)

Continue reading
Read more

How to Calculate Cutting Length of Rectangular Column Ties (Stirrups)

Continue reading

Add comment Cancel reply

Your email address will not be published. Required fields are marked

Search

Categories

  • 3D Elevation (19)
  • 3D Interior (27)
  • AutoCAD Drawing (63)
  • Basics of Engineering (57)
  • Bill of Quantity (10)
  • Calculator (4)
  • Civil Engineering Gallery (19)
  • Construction Templates (26)
  • Estimation (32)
  • INFO (2)
  • Math Puzzle (12)
  • Method Statements (5)

Latest Post

How to Calculate Footing Steel Reinforcement ...

April 20, 2026 0

Contractor Inspection Request Form Template -2

March 16, 2026 0

Checklist for Block Work Template

February 5, 2026 0

Checklist for Concrete Work Template

February 4, 2026 0
Home
Shop
0 Wishlist
Search
Engineering Logo

Commit to Excellence

Get in touch with us

f you’ve got great templates and work dashboards your looking to work with us then drop us a line.

Facebook Instagram Pinterest
  • Information

    • Privacy Policy

    • Contact Us

    • Refund policy

Copyright © 2026 – Civil Engineering QS