How much Cement, Sand, Aggregate quantities required for 1 mᶟ of Concrete?

Posted on September 19, 2022
If, GRADE OF CONCRETE IS M-05, Ratio of M-05 Concrete – 1: 5: 10

CEMENT
: – Required Quantity of Cement is – 0.096 mᶟ,
29 bags of Cement required for 1mᶟ, So, 2.79 bags say 3 Bags of cement are required, 1 cement Bag is equal to 50 Kg So, 139.56 Kg is Cement is required. (Without any Wastage)

SAND : – Required Quantity of Sand is – 0.481 mᶟ / 16.993 ftᶟ (Without any Wastage)

AGGREGATE : – Required Quantity of Sand is – 0.963 mᶟ / 33.99 ftᶟ (Without any Wastage)

If, GRADE OF CONCRETE IS M-7.5, Ratio of M-7.5 Concrete – 1: 4: 8

CEMENT : – Required Quantity of Cement is – 0.118 mᶟ,29 bags of Cement required for 1mᶟ, So, 3.43 bags say 3.5 bags of cement are required, 1 cement Bag is equal to 50 Kg So, 171.169 Kg is Cement is required. (Without any Wastage)

SAND : – Required Quantity of Sand is – 0.474 mᶟ / 16.732 ftᶟ (Without any Wastage)

AGGREGATE : -Required Quantity of Sand is – 0.948 mᶟ / 33.46 ftᶟ (Without any Wastage)

If, GRADE OF CONCRETE IS M-10, Ratio of M-10 Concrete – 1: 3: 6

CEMENT : – Required Quantity of Cement is – 0.154 mᶟ,29 bags of Cement required for 1mᶟ, So, 4.46 bags say 4.50 bags of cement are required, 1 cement Bag is equal to 50 Kg So, 223.30 Kg is Cement is required. (Without any Wastage)

SAND : – Required Quantity of Sand is – 0.462 mᶟ / 16.313 ftᶟ (Without any Wastage)

AGGREGATE : –  Required Quantity of Sand is – 0.924 mᶟ / 32.63 ftᶟ (Without any Wastage)

If, GRADE OF CONCRETE IS M-15, Ratio of M-15 Concrete – 1: 2: 4

CEMENT : – Required Quantity of Cement is – 0.220 mᶟ,29 bags of Cement required for 1mᶟ, So, 6.38 bags say 6.50 bags of cement are required, 1 cement Bag is equal to 50 Kg So, 319.00 Kg is Cement is required. (Without any Wastage)

SAND : – Required Quantity of Sand is – 0.440 mᶟ / 15.536 ftᶟ (Without any Wastage)

AGGREGATE : –  Required Quantity of Sand is – 0.880 mᶟ / 31.07 ftᶟ (Without any Wastage)

If, GRADE OF CONCRETE IS M-20, Ratio of M-20 Concrete – 1: 1.5: 3

CEMENT : – Required Quantity of Cement is – 0.280 mᶟ,29 bags of Cement required for 1mᶟ, So, 8.12 bags say 8.50 bags of cement are required, 1 cement Bag is equal to 50 Kg So, 406.00 Kg is Cement is required. (Without any Wastage)

SAND : – Required Quantity of Sand is – 0.420 mᶟ / 14.830  ftᶟ (Without any Wastage)

AGGREGATE : –  Required Quantity of Sand is – 0.840 mᶟ / 29.66  ftᶟ (Without any Wastage)

If, GRADE OF CONCRETE IS M-25, Ratio of M-25 Concrete – 1: 1: 2

CEMENT : – Required Quantity of Cement is – 0.385 mᶟ,29 bags of Cement required for 1mᶟ, So, 11.16 bags Say 11.50 bags of cement are required, 1 cement Bag is equal to 50 Kg So, 558.25 Kg is Cement is required. (Without any Wastage)

SAND : – Required Quantity of Sand is – 0.385  mᶟ / 13.594  ftᶟ (Without any Wastage)

AGGREGATE : -Required Quantity of Sand is – 0.770 mᶟ / 27.16  ftᶟ (Without any Wastage)

Required Quantity of Cement, Sand, Aggregate for 1 mᶟ of Concrete

 Concrete Grade  Ratio Volume of Concrete  Required Cement Quantity  Required Sand Quantity  Required Aggregate Quantity 
 M-05  1:5:10 1 mᶟ  0.096 mᶟ / 2.79 Bags / 139.56 Kg 0.481 mᶟ/16.993 ftᶟ 0.963 mᶟ/33.99 ftᶟ
 M-7.5  1:4:8 1 mᶟ  0.118 mᶟ /3.43 Bags / 171.769 Kg 0.474 mᶟ/16.732 ftᶟ 0.948 mᶟ/33.46 ftᶟ
 M-10  1:3:6 1 mᶟ  0.154 mᶟ / 4.46 Bags / 223.30 Kg 0.462 mᶟ/ 16.313 ftᶟ 0.924 mᶟ/32.63  ftᶟ
 M-15  1:2:4 1 mᶟ  0.220 mᶟ / 6.38 Bags / 319.00 Kg 0.440 mᶟ/15.536 ftᶟ 0.880 mᶟ/31.07 ftᶟ
 M-20  1:1.5:3 1 mᶟ  0.280 mᶟ / 8.12 Bags / 406.00 Kg 0.420 mᶟ/ 14.830 ftᶟ 0.840 mᶟ/29.66  ftᶟ
 M-25  1:1:2 1 mᶟ  0.385 mᶟ /11.16 Bags / 558.250 Kg 0.385 mᶟ/13.594 ftᶟ 0.770 mᶟ/27.16 ftᶟ

Related posts:

MEP Clearance Form for Prior Start of Civil Work

UNITS OF MEASUREMENTS

How to Calculate Weight of Reinforced steel Rod

14 Different types of wood joints and their uses

What is Cover Block, Importance of Cover Block ,Size of Cover Blocks for Structural Members

What is 3-4-5 Method in Construction? How to Ensure Perfect 90° Angles in Foundation Layout

Important Notes about Civil Engineering / Important Question & Answer about Civil Engineering

What is Column in construction and what are the Type of Columns are used in Construction

Share this post to your social media

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • 3D Designs
  • AutoCAD Drawings
  • Civil Engineering Gallery
  • Contact Us
  • Math Puzzle
  • Privacy Policy
  • Facebook
  • Threads
  • LinkedIn
  • YouTube
  • Instagram
  • Pinterest
  • X

Standard Wastage Percentages for Common Construction Materials - PART-02

How to Calculate Cutting Length of Circular Ties (Links)

Different Types of MS bars / Mild Steel bars

Construction Drawing Abbreviations – Complete A to Z List

Advanced Machineries in Construction - 4

How to Calculate Unit Weight of Reinforcement Steel

Rebar Couplers: A Modern Solution for Stronger Concrete reinforcement

Advanced Machineries in Construction - 1

  • 3D Elevation (19)
  • 3D Interior (27)
  • AutoCAD Drawing (61)
  • Basics of Engineering (56)
  • Bill of Quantity (12)
  • Calculator (4)
  • Civil Engineering Gallery (19)
  • Construction Templates (15)
  • Estimation (30)
  • INFO (3)
  • Math Puzzle (11)
  • Method Statements (5)
  • Uncategorized (2)
  • Non-Conformance Report (NCR) Template for Construction Projects
  • How to Calculate Footing Steel Reinforcement – Free Excel BBS Template
  • Project Monthly Progress Report Template
  • Project Progress Report -Template
  • Daily Site Report / Diary Template for Construction Projects
  • Invoice Template – Suitable for All Industries
  • 3D Designs
  • AutoCAD Drawings
  • Civil Engineering Gallery
  • Contact Us
  • Math Puzzle
  • Privacy Policy
  • Facebook
  • Threads
  • YouTube
  • LinkedIn
  • Instagram
  • Pinterest
  • X
©2025 | Design: Newspaperly WordPress Theme