MEP Clearance Form for Prior Start of Civil Work

Posted on May 9, 2024

MEP – Mechanical, Electrical & plumbing work clearance Form to prior to start civil work

          In construction industry all work interconnected with another work like civil works inter connected with  MEP work , also MEP work is interconnected with civil work, Before commencing any construction work we have to co-ordinate with MEP team, make sure that all system of work are installed properly and tested as per project specification, also we have to get signature from the MEP team in MEP clearance form is necessary.

          The MEP clearance form encourage communication between Civil & MEP team, this guarantees the both team aware the future & progress issues and can collaborate for a good construction process.

          Mainly this will help for both team if any damages or not good quality of work done by MEP team they cant provide the clearance, because they will face issue after completion of civil work they have to break again and plaster again it will make them extra cost, manpower, materials.

          Alternatively, if the civil team damages any MEP work after both parties have accepted it in the MEP clearance form, the MEP team retains the eligibility to impose backcharges for rework to rectify the damages.

Here is one of the sample MEP clearance form prior to start Plastering work . If you need the Excel file, please click the download button below.

 

Request For MEP Clearance form

REQUEST FOR MEP CLEARANCE
Main Contractor Company Logo Sub Contractor Company Logo
Project Name :- Construction of B+G+23 floor Apartment Date :
Main Contractor Name :- Contract Ref No :
Sub Contractor Name :- Request No :
Reason For Request :- To start plastering work to kitchen
Location :- Apartment 16 & 17 Kitchen
NOTE :- We request your confirmation of completion of MEP Work to start the civil works at the mentioned location.
Mechanical Engineer Comments
Conduit installation & testing completed, no objection for Plastering work
Electrical Engineer Comments
Switch box & wire pulling work is completed , no objection for Plastering work
Mechanical Engineer
Name
Signature
Electrical Engineer
Name
Signature
Main Contractor Representative signature
This site clarification shall not authorize any change to the contract or constitute a variation to the contract sum or duration

Related posts:

Water Stoppers in Construction: Types, Applications, and Advantages

List of Equipment's, Machineries & tools form for consultant

How to Calculate Cutting Length of Rectangular Column Ties (Stirrups)

Advanced Machineries in Construction - 4

What is Cover Block, Importance of Cover Block ,Size of Cover Blocks for Structural Members

IMPORTANT NOTES ABOUT STEEL / IMPORTANT NOTES ABOUT REINFORCEMENT STEEL

Important Notes about Civil Engineering / Important Question & Answer about Civil Engineering

Concrete Grades in Construction: What They Mean & How They're Used

Share this post to your social media

1 thought on “MEP Clearance Form for Prior Start of Civil Work”

  1. Jai Chauhan says:
    September 20, 2024 at 12:49 pm

    Best Practices to avoid any rework resulting cost & time saving including quality.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • 3D Designs
  • AutoCAD Drawings
  • Civil Engineering Gallery
  • Contact Us
  • Math Puzzle
  • Privacy Policy
  • Facebook
  • Threads
  • LinkedIn
  • YouTube
  • Instagram
  • Pinterest
  • X

Advanced Machineries in Construction - 3

Common Defects in Concrete and Their Causes

Various Units of measurements for construction works/Activity

Water Stoppers in Construction: Types, Applications, and Advantages

Basic Unit Conversion Table

How much Cement, Sand, Aggregate quantities required for 1 mᶟ of Concrete?

Advanced Machineries in Construction - 2

How to calculate volume & Water capacity of Rectangular Tank

  • 3D Elevation (19)
  • 3D Interior (27)
  • AutoCAD Drawing (61)
  • Basics of Engineering (57)
  • Bill of Quantity (12)
  • Calculator (4)
  • Civil Engineering Gallery (19)
  • Construction Templates (15)
  • Estimation (31)
  • INFO (3)
  • Math Puzzle (12)
  • Method Statements (5)
  • Uncategorized (2)
  • Non-Conformance Report (NCR) Template for Construction Projects
  • How to Calculate Footing Steel Reinforcement – Free Excel BBS Template
  • Project Monthly Progress Report Template
  • Project Progress Report -Template
  • Daily Site Report / Diary Template for Construction Projects
  • Invoice Template – Suitable for All Industries
  • 3D Designs
  • AutoCAD Drawings
  • Civil Engineering Gallery
  • Contact Us
  • Math Puzzle
  • Privacy Policy
  • Facebook
  • Threads
  • YouTube
  • LinkedIn
  • Instagram
  • Pinterest
  • X
©2025 | Design: Newspaperly WordPress Theme
Go to mobile version