Posted on May 6, 2022

Waterproofing Work

Buildings is the method of forming a barrier over surfaces of foundations, roofs, walls, bathrooms and other structural members of buildings to prevent water penetrations through these surfaces. In summary, building surfaces are made water-resistant and waterproof.

There are different type of water proofing method is used in Roofing work , Following BOQ sample for Roof is Torch applied bituminous Water proofing.

A Bill of Quantities (BOQ) for Substructure Waterproofing Work is a detailed document used in construction projects to enumerate and quantify the various resources required for waterproofing the substructure of a building. This comprehensive document is crucial for cost estimation, tendering, and project management, providing a clear breakdown of materials, labor, and other essential elements

“Here is a sample of the bill of quantity for Substructure Water Proofing Work , formatted as follows

Click here below download button for to download this BOQ

Download Now

BILL OF QUANTITY FOR SUBSTRUCTURE WATER PROOFING WORK

BILL OF QUANTITY FOR SUBSTRUCTURE WATER PROOFING WORK
Si.No Description Unit Quantity Unit Rate Amount Remark
Bill of Quantity for Water Proofing Work- Torch applied (or) Self adhesive membrane
Horizontal Area Water Proofing-Basemen, Raft, Footing ,Foundation
1 Supply and apply 50-100 mm thick plain cement concrete on Horizontal Surface as per project specification m2
2 Surface Preparation on horizontal area before application of water proofing work m2
3 Supply and apply one (or) two coat approved bituminous primer, as per project specification m2
4 Supply and apply one (or) Two Layer Approved Torch applied (or) Self adhesive bituminous water proofing membrane over the primer surface, as per project specification m2
5 Supply and apply one layer Geotextile (or) Terram Sheet as a separation layer over the membrane surface, as per project specification m2
6 Supply and Apply 50-100mm thick protection screed over the separation layer , as per project specification m2
Vertical Area Water Proofing- Retaining Wall , Column , Footing
7 Supply and apply one (or) two coat approved bituminous primer, as per project specification m2
8 Supply and apply one (or) Two Layer Approved Torch applied (or) Self adhesive bituminous water proofing membrane over the primer surface, as per project specification m2
9 Supply and apply one layer bituminous (or) polypropylene protection board over the membrane surface, as per project specification m2
10 Supply and apply aluminum flashing on Wall or Column Termination area , as per project specification lm
Bill of Quantity for Water Proofing Work- Polyvinyl Chloride (PVC) Membrane
Horizontal Area Water Proofing-Basemen, Raft, Footing ,Foundation
1 Supply and apply 50-100 mm thick plain cement concrete on Horizontal Surface, as per project specification m2
2 Surface Preparation on horizontal area before application of water proofing work m2
3 Supply and Apply one layer geotextile as a base layer over the prepared area, as per project specification m2
4 Supply and apply one layer PVC membrane over the geotextile, joints treated with glue and melting, as per project specification m2
5 Supply and Apply one layer geotextile as a top layer over the PVC Membrane , as per project specification m2
6 Supply and Apply 50-100mm thick protection screed over the separation layer , as per project specification m2
Vertical Area Water Proofing- Retaining Wall , Column , Footing
7 Supply and Apply one layer geotextile as a base layer over the prepared area, as per project specification m2
8 Supply and apply one layer PVC membrane over the geotextile, joints treated with glue and melting, as per project specification m2
9 Supply and Apply one layer geotextile as a top layer over the PVC Membrane, as per project specification m2
10 Supply and apply one layer polypropylene protection board over the geotextile, as per project specification m2
11 Supply and apply aluminum flashing on Wall or Column Termination area , as per project specification lm
Total Value of Work Done For Substructure Water proofing Work

Related posts:

Bill of Quantity (BOQ) for Masonry Work

How to Calculate Excavation Work (or) Volume of Excavation Quantity?

How to calculate volume & Water capacity of Rectangular Tank

How to calculate volume & Water capacity of Circular Tank

How to calculate the volume of Prism ?

Bill of Quantity (BOQ) for Metal Work

Bill of Quantity (BOQ) for Roof Water Proofing Work

How to Calculate the Surface Area and Volume of a Cone

Share this post to your social media

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • 3D Designs
  • AutoCAD Drawings
  • Civil Engineering Gallery
  • Contact Us
  • Math Puzzle
  • Privacy Policy
  • Facebook
  • Threads
  • LinkedIn
  • YouTube
  • Instagram
  • Pinterest
  • X

Payment Certificate Template – Suitable for All Industries

How to Calculate Backfilling Quantity (or) Volume of Backfilling Quantity?

Bill of Quantity (BOQ) For Plastering Work

How to Calculate Number of blocks or Hollow blocks Quantities in block wall ?

How to Calculate Number of Brick Quantity in brick wall

How to Calculate Cutting Length of Circular Ties (Links)

How to Calculate Cutting Length of Rectangular Column Ties (Stirrups)

How to Calculate Cement, Sand, Quantities for Plastering Work ?

  • 3D Elevation (19)
  • 3D Interior (27)
  • AutoCAD Drawing (61)
  • Basics of Engineering (56)
  • Bill of Quantity (12)
  • Calculator (4)
  • Civil Engineering Gallery (19)
  • Construction Templates (15)
  • Estimation (30)
  • INFO (3)
  • Math Puzzle (11)
  • Method Statements (5)
  • Uncategorized (2)
  • Non-Conformance Report (NCR) Template for Construction Projects
  • How to Calculate Footing Steel Reinforcement – Free Excel BBS Template
  • Project Monthly Progress Report Template
  • Project Progress Report -Template
  • Daily Site Report / Diary Template for Construction Projects
  • Invoice Template – Suitable for All Industries
  • 3D Designs
  • AutoCAD Drawings
  • Civil Engineering Gallery
  • Contact Us
  • Math Puzzle
  • Privacy Policy
  • Facebook
  • Threads
  • YouTube
  • LinkedIn
  • Instagram
  • Pinterest
  • X
©2025 | Design: Newspaperly WordPress Theme
Go to mobile version