How to Calculate Cement, Sand, and Aggregate Quantities in Concrete?

Posted on May 20, 2022

CONCRETE:-

Concrete it’s a construction component, a mixture of cement, sand, and course or fine aggregate with water which is called us concrete, which is used in construction in different structures, In Construction industry concrete are used to mix in following ways as follows

1.Hand Mix Concrete 2. Machine mix Concrete 3. Ready Mix Concrete

How to Calculate Cement, Sand, and Aggregate Quantities in Concrete

For Example size of slab
Length (L) – 1m, Width (B) – 1m, Thickness /Depth (D) -1.0 m

SO, Total Volume of concrete = (L x B x D) = 1 x 1 x 1 = 1.0 mᶟ

if Grade of Concrete -M7.5 ,  Ratio of M 7.5 Concrete – 1 : 4 : 8

Which Means 1% of  Cement, 4% of  Sand & 8% of Aggregate

FORMULA TO FIND THE QUANTITIES OF CEMENT, SAND, AGGREGATE IS

Formula = \frac{Dry Volume of Concrete  *  Volume of Concrete  *  Ratio of (Cement / Sand /Aggregate) }{Total Ratio (Cement + Sand + Aggregate)}  

Dry Volume of Concrete -1.54 mᶟ  , Volume of Concrete -1.0 mᶟ

Ratio of Cement = 1,  Ratio of Sand =4,  Ratio of Aggregate =8 ,  Total Ratio (1+ 4+ 8) = 13

Required Quantity of Cement , Sand & Aggregate in 10 mᶟ Concrete is

Cement = \frac{1.54 * 1 * 1}{ 1 +  4 +  8}   = 0.118 mᶟ


Sand= \frac{1.54 * 1 * 4}{ 1 +  4 +  8}   = 0.474 mᶟ


Aggregate = \frac{1.54 * 1 * 8}{ 1 +  4 +  8}   = 0.948 mᶟ

Which Means 1.0 mᶟ of M7.5 Grade Concrete Required,

Cement – 0.118 mᶟ / 1mᶟ of cement Equal to 29 bags of Cement,

So, 1.184 x 29 = 3.43 Bags of Cement is required

1 Bag of cement to is Equal to 50Kg, So 50 x 3.43 = 171.169 kg Cement Required (Without Any Wastage)

Sand – 0.474 mᶟ / 1mᶟ equal to 35.31 cu.ft / cubic foot / ftᶟ

So, 0.474 x 35.31 = 16.732 cu.ft / cubic foot Sand is required (Without Any Wastage)

Aggregate – 0.948 mᶟ / 1mᶟ equal to 35.31 cu.ft / cubic foot / ftᶟ

So, 0.948 x 35.31 = 33.463 cu.ft / cubic foot Aggregate is required (Without Any Wastage)

Related posts:

Bill of Quantity (BOQ) for Masonry Work

Bill of Quantity (BOQ) For Plastering Work

How to Calculate the Surface Area and Volume of a Cone

Bill of Quantity (BOQ) for Substructure Water Proofing Work

How to Calculate Quantities for Flooring Work from Drawing? How to calculate Tile, Marble, Granite Q...

How to Calculate the Actual Width of a Road Cross Section

Bill of Quantity (BOQ) for Excavation & Back Filling Work

Bill of Quantity (BOQ) for Metal Work

Share this post to your social media

4 thoughts on “How to Calculate Cement, Sand, and Aggregate Quantities in Concrete?”

  1. Israfil says:
    August 19, 2023 at 6:15 pm

    Hi, may I get all information of civil engineering calculation?

    Reply
  2. LASISI TAOFEEK says:
    August 19, 2023 at 6:17 pm

    The NOTE is very interesting. I wish you to supply me more it. Thanks.

    Reply
  3. Wahab Kamolideen says:
    August 20, 2023 at 2:12 am

    How did you convert volume of cement to bag of cement?

    Reply
    1. Iyman Faisal says:
      August 20, 2023 at 6:28 am

      1mᶟ of cement Equal to 29 bags of Cement,
      1 Bag of cement to is Equal to 50Kg.
      For full details:- https://civilengineeringqs.com/how-to-calculate-cement-sand-and-aggregate-quantities-in-concrete/

      Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • 3D Designs
  • AutoCAD Drawings
  • Civil Engineering Gallery
  • Contact Us
  • Math Puzzle
  • Privacy Policy
  • Facebook
  • Threads
  • LinkedIn
  • YouTube
  • Instagram
  • Pinterest
  • X

How to Calculate the Surface Area and Volume of a Cone

Common Mathematical Symbols: Definitions and Uses

Bill of Quantity (BOQ) for Painting Work

How to calculate volume & Water capacity of Circular Tank

How to calculate the slant length of cone

Bill of Quantity (BOQ) for Carpentry Work

How to Calculate Number of blocks or Hollow blocks Quantities in block wall ?

How to calculate volume & Water capacity of Rectangular Tank

  • 3D Elevation (19)
  • 3D Interior (27)
  • AutoCAD Drawing (62)
  • Basics of Engineering (57)
  • Bill of Quantity (12)
  • Calculator (4)
  • Civil Engineering Gallery (19)
  • Construction Templates (18)
  • Estimation (31)
  • INFO (3)
  • Math Puzzle (12)
  • Method Statements (5)
  • Uncategorized (2)
  • Daily Site Report Template -2 for Construction Projects
  • Final Account Statement Template
  • Concrete Pour Card Template for Construction Projects
  • Non-Conformance Report (NCR) Template for Construction Projects
  • How to Calculate Footing Steel Reinforcement – Free Excel BBS Template
  • Project Monthly Progress Report Template
  • 3D Designs
  • AutoCAD Drawings
  • Civil Engineering Gallery
  • Contact Us
  • Math Puzzle
  • Privacy Policy
  • Facebook
  • Threads
  • YouTube
  • LinkedIn
  • Instagram
  • Pinterest
  • X
©2025 | Design: Newspaperly WordPress Theme
Go to mobile version