Skip to content
Menu
  • Home
  • Basics of Engineering
  • Estimation
  • Bill of Quantity (BOQ)
  • Method Statements & Inspection
    • Method of statement
    • Inspection & Checklist
  • Math Puzzle
  • AutoCAD Drawings
  • 3D Designs
  • Question & Answers
    • Concrete Technology
    • Engineering Material
    • Surveying
    • Structural Analysis
    • Soil Mechanics & Foundation Engineering
    • Project management
    • Fluid Mechanics & Hydraulics
    • Transportation Engineering
    • Sanitary Engineering
  • Civil Engineering Gallery
  • Contact Us
Menu

How to Calculate Cement, Sand, Quantities for Plastering Work ?

Posted on May 24, 2022April 8, 2025 by Iyman Faisal
Post views 8,656

Plastering: – This work activity means a thin layer of mortar, applied over the Wall & ceiling masonry, which it acts like a damp-proof coat over the masonry work

Mortar: – Is a mixture of Cement (or) Lime, sand & water, which is used in masonry work in construction to fill the gaps between the bricks and blocks.

How to Calculate Cement, and Sand Quantities in Plastering Work

For Example size of Wall

Length of Wall (L) – 50m, Height of Wall (H) – 4.0m,

Thickness of Plaster (T) – 12 mm (Inner Wall)

STANDART PLASTER THICKNESS

Plastering Area Thickness of Plaster
Inner Plaster Work 10-12 mm
Outer Plaster Work 15-20 mm
Ceiling Plaster Work 6-8 mm


Plaster Area =Length × Height

Plaster Area =50×4 =200.00m2

Volume of Mortar = Plaster Area x Plaster Thickness in meter

Volume of Mortar = 200.00 x 0.012 = 2.40 má¶Ÿ

If Ratio of Plaster is – 1:6 , Which Means 1% of Cement & 6 % of Sand

FORMULA TO FIND THE QUANTITIES OF CEMENT, SAND  IS

Formula = \frac{Dry Volume of mortar  *  Volume of mortar *  Ratio of (Cement /Sand) }{Total Ratio (Cement + Sand)}  

If it is Outer Wall Dry Volume of  mortar -1.33má¶Ÿ

Volume of Mortar -2.4 má¶Ÿ

Ratio of Cement = 1, Ratio of Sand =6, ,  Total Ratio (1+ 6) = 7

Required Quantity of Cement & Sand in 2.4 má¶Ÿ Plastering Work  is

Cement = \frac{1.33 * 2.4 * 1}{ 1 +  6}   = 0.456 mᶟ

Sand= \frac{1.33 * 2.4* 6}{ 1 +  6}   = 2.736 mᶟ

Which Means 1:6 mortar Ratio of Plastering Works  Required,

Cement – 0.456 mᶟ / 1mᶟ of cement Equal to 29 bags of Cement,

So, 0.456x 29 = 13.224 Bags of Cement is required

1 Bag of cement to is Equal to 50Kg, So 50 x 13.224  =661.20 kg Cement Required

Sand – 2.736 má¶Ÿ / 1má¶Ÿ equal to 35.31 cu.ft / cubic foot / ftá¶Ÿ

So, 2.736 x 35.31 = 96.608 cu.ft / cubic foot Sand is required

Related posts:

Bill of Quantity (BOQ) for Painting Work

How to Calculate Number of blocks or Hollow blocks Quantities in block wall ?

Bill of Quantity (BOQ) for Masonry Work

How to calculate volume & Water capacity of Rectangular Tank

Bill of Quantity (BOQ) for Tiles & Marble

Common Mathematical Symbols: Definitions and Uses

How to Calculate Cutting Length of Circular Ties (Links)

Bill of Quantity (BOQ) For Plastering Work

Share this post to your social media

2 thoughts on “How to Calculate Cement, Sand, Quantities for Plastering Work ?”

  1. Stanley Maina says:
    August 19, 2023 at 9:42 am

    Thank you for the learning guidelines.

    Reply
  2. Ricky Boodoo says:
    March 28, 2024 at 2:19 am

    Thanks for the info

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • 3D Designs
  • AutoCAD Drawings
  • Civil Engineering Gallery
  • Contact Us
  • Math Puzzle
  • Privacy Policy
  • Facebook
  • Threads
  • LinkedIn
  • YouTube
  • Instagram
  • Pinterest
  • X

Most Viewed Posts

  • Civil Engineering GalleryCivil Engineering Gallery (65,390)
  • Contact Us (37,337)
  • Bill of Quantity (BOQ) for Excavation & Back Filling Work (29,185)
  • How to Calculate Backfilling Quantity (or) Volume of Backfilling Quantity? (25,576)
  • How to calculate concrete Volume for Rectangular, Square & Circular Column (19,326)
  • 3D Elevation (19)
  • 3D Interior (27)
  • AutoCAD Drawing (24)
  • Basics of Engineering (54)
  • Bill of Quantity (10)
  • Civil Engineering Gallery (36)
  • Estimation (27)
  • Math Puzzle (6)
  • Method Statements & Inspection (1)
  • Question & Answers (10)
  • Uncategorized (5)
  • How to Calculate Cutting Length of Circular Ties (Links)
    How to Calculate Cutting Length of Circular Ties (Links) in...
  • Ductile Iron Manhole Covers Detailed Explanation
    Manhole cover A manhole cover is a removable plate that...
  • Common Mathematical Symbols: Definitions and Uses
    Mathematical symbols are important tools that help us to understand...
  • How to calculate the slant length of cone
    What is Slant length of cone To finding slant length...
  • How to Calculate the Surface Area and Volume of a Cone
    How to Calculate the Surface Area and Volume of a...
  • 3D Designs
  • AutoCAD Drawings
  • Civil Engineering Gallery
  • Contact Us
  • Math Puzzle
  • Privacy Policy
  • Facebook
  • Threads
  • YouTube
  • LinkedIn
  • Instagram
  • Pinterest
  • X
©2025 | Design: Newspaperly WordPress Theme