Bill of Quantity (BOQ) for Concrete Work

Posted on January 8, 2023

What is Concrete & BOQ for Concrete Work

Concrete it’s a construction component, a mixture of cement, sand, and course or fine aggregate with water which is called us concrete, which is used in construction in different structures.

A Bill of Quantity (BOQ) for concrete work is a detailed document that itemizes and quantifies all the materials, labor, equipment, and other resources required for a specific concrete construction project. It serves as a comprehensive guide for estimating costs, procuring materials, and executing the concrete work according to the project specifications.

“Here is a sample of the bill of quantity for concrete work, formatted as follows

Click here below download button for to download this BOQ

Download Now

Bill of Quantity for Concrete Work

Si.No Description Unit Rate Quantity Amount
1 Rates of Concrete Works shall include :-        
1.1 Supplying, Casting, vibrating and curing as per specifications. Included    
1.2 Approved additives and admixtures. Included    
1.3 Incurred costs on New Concrete Job Mix Designs, Sampling, testing and providing test results certificates, storing and saving of samples, and preparation of bar bending schedules and workshops. Included    
1.4 Compaction and testing under the foundation, ground beams, and ground slabs, the compaction must exceed 98% of MDD. Included    
1.5 Prices including Mix Design, striking, polyethylene sheet (for any concrete contact with the soil) Included    
1.6 external surfaces, workmanship, all ducts, sleeves, opening areas and the concrete surface shall be finished with mechanical steel trowel and the price shall include steel trowelling with smooth face (fair face)and anywhere else, needed Included    
1.7 All works according to specifications , drawings and supervisor engineer instructions Included    
  Plain Cement concrete -A        
A Supply and cast plain Cement concrete-A (200) kg/cm2 & including all Materials & as per Drawings Specification & supervisor engineer instructions        
A.1 For Below foundations, supports, anchor blocks, benching, slopes.   For blinding beds including polythene sheets as per specifications. m3      
  Reinforced Cement Concrete - B        
B Supply and cast ready mix reinforced concrete-B (300) kg/cm2 & including all Materials & as per Drawings Specification & supervisor engineer instructions        
B.1 For Foundations &  ground beams m3      
B.2 For stairs including flights, landings, steps & drop beams m3      
B.3 Beams, Ramp & parapet m3      
B.4 For inverted beams everywhere in the slab drainage, electrical, air conditioning, mechanical ducts m3      
B.5 For solid slab, staircase slab and duct Slab & Concrete Decoration m3      
  Reinforced Cement Concrete - C        
C Supply and cast ready mix reinforced concrete-C (350) kg/cm2 & including all Materials & as per Drawings Specification & supervisor engineer instructions        
C.1 For columns and column necks m3      
C.2 For reinforced walls and solid slab and Openings cover pre-casting m3      
  Reinforced Cement Concrete - D        
D Supply and cast ready mix reinforced concrete-D (250) kg/cm2 & including all Materials & as per Drawings Specification & supervisor engineer instructions        
D.1 For Ground Slab 10cm thick with steel mesh 8mm diameter every 20cm including polythene sheets below concrete slab m3      
D.2 For External steps & its edge beams. Including flights, landings, steps, drop, inverted beams and hand rail wall including entrance stairs, Ramp & parapet m3      
D.3 For Expansion joints inverted beams at the roof m3      
D.4 For doors and Windows lintels and roof coping m3      
           
  Total Value of Work Done        

Related posts:

How to Calculate Cutting Length of Rectangular Column Ties (Stirrups)

Bill of Quantity (BOQ) for Metal Work

How to calculate the Volume & Surface area of Circular Column / Volume Of Concrete / Area Of Shutter...

How to Calculate Quantities for Painting Quantity for Room Internal Walls From Drawing?

Bill of Quantity (BOQ) for Carpentry Work

Common Mathematical Symbols: Definitions and Uses

Bill of Quantity (BOQ) for Masonry Work

How to calculate the slant length of cone

Share this post to your social media

6 thoughts on “Bill of Quantity (BOQ) for Concrete Work”

  1. Melissa says:
    January 9, 2023 at 11:15 am

    Its more useful, Really appreciate this work.

    1. Iyman Faisal says:
      March 30, 2023 at 7:12 pm

      Thank you for your kind words!

  2. Decorative Garden Wall says:
    June 10, 2023 at 7:09 am

    Insightful advice on drafting a Bill of Quantity for concrete work is provided in this blog post. It illustrates why it’s crucial to make precise material and price estimates for concrete construction jobs. Professionals in the fields of civil engineering and construction will find the post’s extensive instructions and guidelines for creating a BOQ to be an invaluable resource.

  3. concrete driveway contractors near me says:
    September 21, 2023 at 6:25 am

    If you want to increase your familiarity just keep visiting this website and be updated with the most
    up-to-date gossip posted here.

  4. Nicholle Marone says:
    November 23, 2023 at 12:39 pm

    It’s difficult to acquire knowledgeable folks with this topic, nevertheless, you seem like there’s more you are referring to! Thanks

  5. Jody Nuchols says:
    November 25, 2023 at 5:18 am

    Great website! I am loving it!! Will be back later to read some more. I am bookmarking your feeds also

Comments are closed.

  • 3D Designs
  • AutoCAD Drawings
  • Civil Engineering Gallery
  • Contact Us
  • Math Puzzle
  • Privacy Policy
  • Facebook
  • Threads
  • LinkedIn
  • YouTube
  • Instagram
  • Pinterest
  • X

How to Calculate Cutting Length of Circular Ties (Links)

Bill of Quantity (BOQ) for Carpentry Work

How to Calculate Excavation Work (or) Volume of Excavation Quantity?

Payment Certificate Template – Suitable for All Industries

How to Calculate the Surface Area and Volume of a Cone

Bill of Quantity (BOQ) for Substructure Water Proofing Work

How to Calculate Footing Steel Reinforcement – Free Excel BBS Template

Bill of Quantity (BOQ) for Painting Work

  • 3D Elevation (19)
  • 3D Interior (27)
  • AutoCAD Drawing (61)
  • Basics of Engineering (56)
  • Bill of Quantity (12)
  • Calculator (4)
  • Civil Engineering Gallery (19)
  • Construction Templates (15)
  • Estimation (30)
  • INFO (3)
  • Math Puzzle (11)
  • Method Statements (5)
  • Uncategorized (2)
  • Non-Conformance Report (NCR) Template for Construction Projects
  • How to Calculate Footing Steel Reinforcement – Free Excel BBS Template
  • Project Monthly Progress Report Template
  • Project Progress Report -Template
  • Daily Site Report / Diary Template for Construction Projects
  • Invoice Template – Suitable for All Industries
  • 3D Designs
  • AutoCAD Drawings
  • Civil Engineering Gallery
  • Contact Us
  • Math Puzzle
  • Privacy Policy
  • Facebook
  • Threads
  • YouTube
  • LinkedIn
  • Instagram
  • Pinterest
  • X
©2025 | Design: Newspaperly WordPress Theme