Bill of Quantity (BOQ) For Plastering Work
Plastering :- This work activity means a thin layer of mortar, applied over the Wall & ceiling masonry, which it acts like a damp-proof coat over the masonry work A Bill of…
IMPORTANT NOTES ABOUT STEEL / IMPORTANT NOTES ABOUT REINFORCEMENT STEEL
IMPORTANT NOTES ABOUT REINFORCEMENT STEEL 1. To find weight of Steel (formula) = D ² /162 (kg /m) 2. To find weight of Steel (formula) = D ² /533 (kg /ft.) 3. Unit Weight of Steel / Density of…
Common Construction drawings Abbreviations and Their Full from
In Engineering drawing abbreviations and symbols are used to communicate and detail the characteristics of an engineering drawing.so we should know the full forms of those codes & abbreviation, some of drawings…
Bill of Quantity (BOQ) for Excavation & Back Filling Work
Excavation means work involving the removal of soil or sand or rock from earth, Excavation quantity usually calculating in m³ (Cubic meter) Backfilling means the process used refilling soil (or) sand an excavated area,…
How to Calculate Quantities for Flooring Work from Drawing? How to calculate Tile, Marble, Granite Quantity for floor from drawing?
Flooring Area is a horizontal Area usually different type of materials are used in flooring work like (concrete flooring, Tile, Granite, marble etc.… How to calculate Quantities for Flooring Work ? How…
How to Calculate Number of blocks or Hollow blocks Quantities in block wall ?
How to Calculate Number of blocks or Hollow blocks Quantities in block wall ? Hollow Block :- is a concrete block used in construction to build an internal & External Walls ,…
How to Calculate Number of Brick Quantity in brick wall
Brick is a construction material it’s made up with clay, composition of brick is Lime 2 to 5% Alumina-clay 20 to 30%, Silica-Sand – 50 to 60%, Bricks are rectangular blocks of…
How to Calculate Cement, Sand, Quantities for Plastering Work ?
Plastering: – This work activity means a thin layer of mortar, applied over the Wall & ceiling masonry, which it acts like a damp-proof coat over the masonry work Mortar: – Is…
How to Calculate Cement, Sand, and Aggregate Quantities in Concrete?
CONCRETE:-Concrete it’s a construction component, a mixture of cement, sand, and course or fine aggregate with water which is called us concrete, which is used in construction in different structures, In Construction…
Bill of Quantity (BOQ) for Roof Water Proofing Work
Waterproofing Work Buildings is the method of forming a barrier over surfaces of foundations, roofs, walls, bathrooms and other structural members of buildings to prevent water penetrations through these surfaces. In summary, building…
Bill of Quantity (BOQ) for Substructure Water Proofing Work
Waterproofing Work Buildings is the method of forming a barrier over surfaces of foundations, roofs, walls, bathrooms and other structural members of buildings to prevent water penetrations through these surfaces. In summary, building surfaces…
How to Calculate Backfilling Quantity (or) Volume of Backfilling Quantity?
Backfilling means the process used refilling soil (or) sand an excavated area, backfilling quantity usually calculating in m³ (Cubic meter), basically There are two type of backfilling method used in construction work….
How to Calculate Excavation Work (or) Volume of Excavation Quantity?
Excavation means work involving the removal of soil or sand or rock from earth, basically two types of excavation methods used in construction 1.Handmade excavation – The Soil or sand or rock…
How to Calculate Weight of Reinforced steel Rod
Reinforcement Steel Usually 6mm, 8mm, 10mm, 12mm, 16mm, 20mm, 25mm, 32mm, 40mm dia size of reinforced steel bar used in construction, in this bars 6mm & 8mm are called as plain bar…